Three linked workstreams, from 2025 to 2029.

Three linked workstreams: widening access to the network, setting up digital tools shared by government administrations, and training the people who operate them. Scheduled to end in 2029.

Context & rationale

The gap is not technological. It is geographic, energy-related and institutional.

Network technologies are available and proven; what is missing are the conditions that make them viable to deploy. A territory of 2.3 million square kilometres, a dispersed population, partial electrification, and public systems designed independently of one another: each of these factors raises the cost of access or prevents its use. The project is anchored in the regional APM IDEA approach, which pools digital integration across Eastern and Southern Africa — because international capacity and transit corridors are negotiated at regional, not national, scale.

kbit/s
Intl. bandwidth per capita at start
provinces · 2.3M km²
2029
horizon of the transformation
Fibre rollout · digital inclusion
Timeline & milestones
25 November 2024
Financing agreement signed with the World Bank
14 March 2025
Financing convention signed with AFD
15 April 2025
Creation of the UGPTN (ministerial order)
23 June 2025
Validation of the Implementation Manual (PIM)
31 October 2025
Project effectiveness
31 December 2029
Technical completion
30 April 2030
IDA disbursement deadline
What it changes for you

What really changes often comes down to one thing: no longer travelling to prove what the administration already knows.

An infrastructure project is judged not by what it installs, but by what it makes possible — and by what it stops imposing. Here, sector by sector, is today's constraint and the precise mechanism that lifts it.

01Administrative paperwork
Today

The same supporting document is demanded at every counter, because no office can check what the neighbouring office holds. The burden of proof falls on the user.

↓
With the project

Information the administration already holds is checked at source, system to system. What is still asked of the user is what the State does not know.

02School & university
Today

Access to resources depends on scarce physical copies and shared bandwidth, where the campus is connected at all. Knowledge travels at the speed of paper.

↓
With the project

A connected institution opens the same collections to all its students, at the same time, whatever the province.

03Small business
Today

The market ends where physical travel ends, and cash payment leaves no record usable to obtain credit.

↓
With the project

Remote selling widens the customer base, and payment history becomes an asset: evidence of activity that a lender can rely on.

04Health
Today

The patient's history stays in the facility where it was written. A transfer, an epidemic or a population movement erases the medical record.

↓
With the project

A reliable identifier and a remotely accessible record make that history portable, and allow specialist advice without moving the patient.

05Financial inclusion
Today

Without verifiable identity, opening an account runs into know-your-customer obligations: exclusion is regulatory as much as economic.

↓
With the project

An inclusive digital identity removes that entry barrier, making saving, payment and, progressively, credit possible.

06Rural areas
Today

Low density and energy costs place these areas below the profitability threshold for a commercial rollout: the network stops there, lastingly.

↓
With the project

Targeted deployment support and adapted energy solutions move that threshold, making coverage sustainable where it was not.

Who benefits

Who benefits, and on what condition.

Citizens

Fewer documents to gather and fewer journeys — provided public registries can talk to each other and a reliable identity exists.

Youth & students

Technical pathways aligned with the trades that are hiring, in equipped and connected institutions — a qualification is worth the signal it sends to employers.

Women

A share that is tracked and reported, in training as in entrepreneurship: inclusion is a measured target, not a stated intention.

Entrepreneurs & startups

Financing released as milestones are met, and equipment pooled in innovation centres rather than bought alone.

Rural communities

Coverage where commercial logic does not lead, and prior consultation where works cross their land.

Public services

Shared building blocks — identity, data exchange, hosting, security — that spare each ministry from rebuilding the same functions.

What we commit to measuring

Quantified ambitions, reviewed as implementation proceeds.

See the results framework →
ODP-1
≈million
People using broadband internet
ODP-2
≈kbit/s
International bandwidth per capita
ODP-3
≈million
People using digital services
ODP-4
≈
Graduates of advanced digital training

Orders of magnitude drawn from the project's results framework. These targets guide implementation; they are reviewed periodically with partners and do not constitute a guarantee of results.

The project & you

The questions we are asked, and our answers.

In three ways, depending on your situation: the network moves closer to you, procedures that required travel move progressively online, and technical training opens in the country's institutions. The effect does not reach everywhere at once: deployment follows a published order of priority.

Follow or take part in the project.

Bid for a contract, follow progress province by province, or report a difficulty: each request is recorded.

Newsletter

Follow the transformation, month by month.

What changes for users: institutions connected, procedures that no longer require a journey, skills trained. And what is holding, when it is.

No spam. One-click unsubscribe.